Showing posts with label cabinet pulls. Show all posts
Showing posts with label cabinet pulls. Show all posts

Tuesday, September 8, 2009

almost there...

all of the trim is attached. the countertops & cabinet pulls are all attached as well. we have toilets, bathroom sinks & mirrors. they installed the microwave. the fireplace mantle & surround is also in place. the big tub for the master bath & the carpet will be last.

one more thing...the water softener & furnace were also installed in the basement.




Tuesday, September 1, 2009

lots of new updates!

this evening we dropped off the lights and cabinet pulls. upon arrival all of the doors were locked so i had to crawl in through the egress window in the basement. :)

the tile is down...grout will be be added tomorrow. cabinets were dropped off and some of them are in place already. they have the basement door and trim attached. the other doors and trim are laid out in the rooms, ready to be added. the countertops were also delivered and are sitting in the garage.